1 00:00:05,430 --> 00:00:03,669 when you're done with that you can stow 2 00:00:07,030 --> 00:00:05,440 the spids in the crew lock bag then 3 00:00:11,030 --> 00:00:07,040 you're going to translate over to the 4 00:00:15,030 --> 00:00:12,629 copy 5 00:00:17,029 --> 00:00:15,040 michelle lindgren in the final steps of 6 00:00:18,550 --> 00:00:17,039 his work to close a pair of quick 7 00:00:21,910 --> 00:00:18,560 disconnects 8 00:00:24,310 --> 00:00:21,920 with a jumper a cable to isolate the 9 00:00:26,070 --> 00:00:24,320 prime and backup cooling systems on the 10 00:00:28,070 --> 00:00:26,080 port truss of the international space 11 00:00:29,589 --> 00:00:28,080 station 12 00:00:31,669 --> 00:00:29,599 chell lindgren 13 00:00:33,750 --> 00:00:31,679 vehicular crew member number one and 14 00:00:36,310 --> 00:00:33,760 scott kelly uh extra vehicular crew 15 00:00:41,670 --> 00:00:36,320 member number two for today's spacewalk 16 00:00:45,990 --> 00:00:43,750 chell lindgren uh 17 00:00:48,950 --> 00:00:46,000 on one section of the port truss of the 18 00:00:52,310 --> 00:00:48,960 international space station retrieving 19 00:00:54,869 --> 00:00:52,320 a series of tools called vent tools 20 00:00:56,790 --> 00:00:54,879 for the ammonia system on the 21 00:00:58,389 --> 00:00:56,800 international space station these tools 22 00:00:59,910 --> 00:00:58,399 will be inserted 23 00:01:03,750 --> 00:00:59,920 at a vent port 24 00:01:05,109 --> 00:01:03,760 to enable residually trapped ammonia 25 00:01:07,830 --> 00:01:05,119 once 26 00:01:08,950 --> 00:01:07,840 the vent panel is configured properly 27 00:01:17,590 --> 00:01:08,960 the 28 00:01:19,749 --> 00:01:17,600 topped off about a 20-minute procedure 29 00:01:22,070 --> 00:01:19,759 but first scott kelly must configure the 30 00:01:23,590 --> 00:01:22,080 ammonia tank assembly to begin that 31 00:01:26,789 --> 00:01:23,600 activity 32 00:01:28,550 --> 00:01:26,799 to handrail 53-21 33 00:01:31,030 --> 00:01:28,560 i'm gonna read both of you through the 34 00:01:32,870 --> 00:01:31,040 big picture on the fill once uh chell is 35 00:01:34,469 --> 00:01:32,880 in position and complete with his steps 36 00:01:36,230 --> 00:01:34,479 so uh big picture for both of you our 37 00:01:38,149 --> 00:01:36,240 next step is the fill 38 00:01:40,149 --> 00:01:38,159 and so scott i have a few steps for you 39 00:01:43,590 --> 00:01:40,159 to get that valve ready for a quick 40 00:01:43,600 --> 00:01:57,590 yes 41 00:02:05,749 --> 00:02:00,230 okay thermometer booty is removed from 42 00:02:11,830 --> 00:02:09,510 okay tell i copy that that is the backup 43 00:02:13,270 --> 00:02:11,840 radiator that was initially used to 44 00:02:16,150 --> 00:02:13,280 dispel heat 45 00:02:18,070 --> 00:02:16,160 from the integrated electronics assembly 46 00:02:21,030 --> 00:02:18,080 and all of its associated systems and 47 00:02:24,949 --> 00:02:21,040 the very early neophyte days of the 48 00:02:28,070 --> 00:02:26,630 hey scott we're just talking about it 49 00:02:29,670 --> 00:02:28,080 and hopefully this isn't too late for 50 00:02:30,949 --> 00:02:29,680 you but if if that 51 00:02:32,309 --> 00:02:30,959 wire tie 52 00:02:36,550 --> 00:02:32,319 doesn't look like it wants to come off 53 00:02:40,710 --> 00:02:38,710 three hours and 48 minutes into the 54 00:02:43,270 --> 00:02:40,720 space walk 55 00:02:45,830 --> 00:02:43,280 chell lindgren and uh scott kelly 56 00:02:48,309 --> 00:02:45,840 are moving along very nicely with the 57 00:02:51,350 --> 00:02:48,319 timeline having started their spacewalk 58 00:02:58,710 --> 00:02:51,360 at 5 22 a.m central time this morning 59 00:03:14,790 --> 00:03:00,630 four 60 00:03:19,190 --> 00:03:17,110 everything going well the trailing 61 00:03:20,790 --> 00:03:19,200 thermal control radiator folding up like 62 00:03:22,309 --> 00:03:20,800 an accordion 63 00:03:24,949 --> 00:03:22,319 as planned 64 00:03:32,149 --> 00:03:24,959 looks like it's coming down nicely 65 00:03:35,190 --> 00:03:33,030 when you get there you're going to 66 00:03:36,309 --> 00:03:35,200 anti-rotation 67 00:03:37,589 --> 00:03:36,319 go ahead 68 00:03:39,190 --> 00:03:37,599 just for scott when you get there you're 69 00:03:40,869 --> 00:03:39,200 going to install the swing arm whiff 70 00:03:46,869 --> 00:03:40,879 into the tara with the arm pointing 71 00:03:49,670 --> 00:03:47,910 okay 72 00:03:51,110 --> 00:03:49,680 got it 73 00:03:53,350 --> 00:03:51,120 this is mission control houston 74 00:03:55,830 --> 00:03:53,360 approaching the four hour mark into 75 00:03:56,789 --> 00:03:55,840 today's spacewalk the latest task now 76 00:03:59,110 --> 00:03:56,799 complete 77 00:04:01,110 --> 00:03:59,120 that being the retraction of the 78 00:04:02,710 --> 00:04:01,120 trailing thermal control radiator the